Romania could triple its data center market in three years
Expert reports estimate 49% growth for emerging DataCenter markets in Europe, which includes Romania.
Expert reports estimate 49% growth for emerging DataCenter markets in Europe, which includes Romania.
Located in Tulcea, the wind farm generates more than 200 GWh of electricity per year.
Ministry of Energy launched on 14 March 2024 under public consultation the draft for the Government Decision and the CfD template agreement.
Midia Marine Terminal exceeded the threshold of 700 vessels operated at the offshore marine terminal, located 8.6 km off the Black Sea.
The works will consist in making loops on medium voltage lines, supplied from the 110/20/10 kV Fratelia and Cetate transformer stations in the Timișoara area.

Energy company Electrica informs investors and the capital market that it has obtained the technical grid connection permits (ATR) for 17 new battery energy storage projects (BESS), with a total capacity of approximately 700 MWh.
The European Retail Banking Radar, Kearney's latest study now in its 18th edition, shows that Europe is entering a period of normalisation following the conditions of 2023–2025. For Romania, the challenge extends beyond the normalisation of interest rates.
Digi Spain has announced its intention to launch an initial public offering (IPO) on the Spanish stock exchanges, aiming to raise approximately €150 million.
Romania's national electricity transmission network operator, Transelectrica, has halted scheduled maintenance shutdowns to ensure the grid operates at maximum capacity during an ongoing extreme heatwave. The preventive measures aim to mitigate operational risks associated with severe weather conditions.
The European Commission has approved, under EU State aid rules, Romanian measures for the national investment and development bank Banca de Investiții și Dezvoltare (BID).