Rompetrol Quality Control celebrates 20 years of activity
Since 2004, the company has carried out over 12.5 million technical analyses, directly supporting the Petromidia Navodari and Vega Ploiesti refineries.
Since 2004, the company has carried out over 12.5 million technical analyses, directly supporting the Petromidia Navodari and Vega Ploiesti refineries.
For the third quarter, the company reported a CCA operating result excluding special items of RON 1.6 billion, down 36%.
With an installed capacity of approximately 710 MW, the photovoltaic parks acquired by OMV Petrom are among the most important projects of this type in South-Eastern Europe.
The 23 wind turbines will be located on land plots in the localities of Deleni, Costești, Bogdănești, while the interconnection transformer station will be located in Banca.
Validation of near-term and long-term science-based greenhouse gas emission reduction targets to reach net-zero by 2040.

Iulius Dan Plaveti has taken over as Chairman of the Board and CEO of Hidroelectrica starting 10 June 2026, with his mandate running until 7 November 2027.
The gap between European and Romanian agricultural economic pressures widened in Q1 2026.
More frequent heatwaves, rising energy costs and concerns about indoor air quality are changing the way Romanians choose climate control solutions.
Romania's annual inflation rate climbed to 10.85% in May from 10.71% in April, driven by rising costs across all sectors, according to data released by the National Institute of Statistics (INS).
Visual Fan has completed the energisation phase of its Full EPC BESS project in Teiuș, featuring a storage capacity of 120 MWh.