Phase IV, the final phase of the residential project, has obtained the urban planning certificate and is in the documentation preparation stage for obtaining the building permit.
Banca Transilvania (BT) reported a consolidated net profit of RON 4.10 billion (€804.7 million) in 2025, representing a 15.96% increase compared to RON 3.53 billion.
State-owned power producer Hidroelectrica Group recorded a 20% fall in net profit during 2025 versus 2024 as the poor water levels significantly impacted hydropower generation and consequently the total volume of energy available for sale.
Romanian energy group Electrica achieved record financial results in 2025, with preliminary net profit reaching RON 1.22 billion (€245 million), representing a 159% increase compared to 2024.