Real estate

Business Forum   |   11 February, 2025 at 5:41 PM

Speedwell Development names new Leasing Director

Speedwell Development has appointed Maria Jianu as its new Leasing Director, tasked with growing the tenant portfolio and strengthening strategic partnerships for projects such as Queens District, SpacePlus and Paltim.

Business Forum   |   11 February, 2025 at 9:20 AM

Romania's industrial pipeline exceeds 200,000 sqm in 2025

Romania's industrial and logistics sector saw a 27% rise in new supply in 2024, with 572,000 sqm of new spaces completed. The total stock now stands at almost 7.6 million sqm, and over 200,000 sqm are currently under development. according to research by Cushman & Wakefield Exhinox.

Business Forum   |   10 February, 2025 at 10:40 AM

Property deals fall in Romania during January

Romania recorded a 17% decrease in the number of transactions in January, compared to the same period last year, totaling just over 8,400 property deals, according to data by the National Agency for Cadastre and Land Registration (ANCPI).

Business Forum   |   7 February, 2025 at 9:48 AM

Industrial leasing in Romania slides 20% during 2024

Leasing of industrial and logistics spaces in Romania amounted to around 620,000 sqm in 2024, down by around 20% compared to the near-record level reached in 2023. The overall stock rose by 400,000 sqm to 7.4 million sqm at the end of last year, according to a report by Colliers. 

RECOMMENDED FROM THE HOME PAGE
Electrica secures grid permits for 700 MWh of storage
Energy

Electrica secures grid permits for 700 MWh of storage

Energy company Electrica informs investors and the capital market that it has obtained the technical grid connection permits (ATR) for 17 new battery energy storage projects (BESS), with a total capacity of approximately 700 MWh.

Energy

Romanian grid operator to support peak power consumption during heatwave

Romania's national electricity transmission network operator, Transelectrica, has halted scheduled maintenance shutdowns to ensure the grid operates at maximum capacity during an ongoing extreme heatwave. The preventive measures aim to mitigate operational risks associated with severe weather conditions.